|
|||
---|---|---|---|
Grouping of Members for Optimized Cut Lengths as per Member Mark. | |||
Cost : Rs 2500.0 |
Mass Production of Steel Fabrication at Site made easy. | ||
Demo, Example & Learn | Know amount of wastage % before commencement of works. | ||
Learn Optimize Bars in 8 Simple Steps Included with the Software. | |||
TYPICAL DISPLAYS |
The above Wastage % Includes bars of > = 2000 MM Cutting Lengths. | ||
Intro and Limitations | Sections eligible for optimization are 28 in Nos :- MC 75 / MC 100 / | ||
Display / Edit Schedule | MC 125/MC 150/MC 175/MC 200/MC 250/MC 300/MC 350/MC 400 | ||
Optimized Records | MB 100 / MB 125 / MB 150 / MB 175 / MB 200 / MB 250 / MB 300 / | ||
M T O | MB 350 / MB 400 / MB 450 / MB 500 / MB 600 | ||
Create Internal Waste | Additional Waste Removal Program is also included with the software. | ||
Remove Wastage | Waste Removal Software, Removes wastages from FAB and Waste File. | ||
Matched Wastage | Facility to Import Member Schedule from CSV Files. | ||
Facility to Import Available Wastages from CSV Files. | |||
Display of Section wise MTO | |||
Display / Edit / Delete facility for FAB and Waste File. | |||
|