Grouping of Bars for Optimized Cutting Lengths as per Bar Marks. | |||
Cost : Rs 2500.0 |
Mass Production of Reinforcement Fabrication at Site made easy. | ||
Demo, Example & Learn | Know amount of wastage % before commencement of works. | ||
Usually for Floor Slabs + Beams gross wastage is around 5 %. | |||
TYPICAL DISPLAYS |
The above Wastage % Includes bars of > = 2000 MM Cutting Lengths. | ||
Intro and Limitations | Learn Optimize Bars in 8 Simple Steps Included with the Software. | ||
Display / Edit BBS | 6, 8, 10, 12, 16, 18, 20, 22, 25, 28, 32 & 36 MM Ø bars are Optimized. | ||
Optimized Records | The Execution Time of optimization is normally within 5 Minutes for a | ||
M T O | BBS File containing about 5.0 tons of reinforcements (3000 Records). | ||
Create Internal Waste | Additional Waste Removal Program is also included with the software. | ||
Remove Wastage | Waste Removal Software, Removes wastages from BBS and Waste File. | ||
Matched Wastage | Facility to Import BBS from CSV Files. | ||
Facility to Import Available Wastages from CSV Files. | |||
Display of Diameter wise MTO | |||
Display / Edit / Delete facility for BBS and Waste File. | |||
|