CONSUMPTION OF CEMENT, SAND, AGGREGATE,
BRICK & WATER
{ ENTER QUANTITIES OF REQUIRED ITEMS & CLICK CONSUMPTION }
( Actual Program is
SUPER CIVIL CD
)
Item
Quantity
Unit
Cement
Sand
Aggregate
Brick
PCC M 5 Grade
cum
PCC M 7.5 Grade
cum
PCC M 10 Grade
cum
RCC M 15 Grade
cum
RCC M 20 Grade
cum
RCC M 25 Grade
cum
Brick masonry in CM 1:4
cum
Brick masonry in CM 1:6
cum
115 mm Brick work CM 1:4
sqm
R.R.masonry in CM 1:6
cum
230 thick rubble pitching
sqm
Plaster 12 mm thk CM 1:4
sqm
Plaster 20 mm thk CM 1:4
sqm
Plaster 20mm CM 1:4 in 2 Coats
sqm
I.P.S.
sqm
I.P.S. + Ironite
sqm
MM tiles in floor
sqm
MM tiles in dado
sqm
MM tiles in skirt.125 mm
rm
WG tiles in flooring
sqm
WG tiles in dado
sqm
Kotah stone in flooring
sqm
Kotah stone in dado
sqm
Kotah stone in skirting
rm
M 15 screed
cum
Grouting
cum
TOTAL CEMENT CONSUMPTION IN BAGS
TOTAL SAND CONSUMPTION IN M3
TOTAL AGGREGATE CONSUMPTION IN M3
TOTAL BRICK CONSUMPTION IN Nos.
TOTAL WATER CONSUMPTION IN LITERS
5 % IS ADDED IN THE TOTAL TO ACCOUNT FOR WASTAGE.
WATER CONSUMPTION IS CALCULATED ON THE ASSUMED W/C RATIO AS 0.50