PROGRAM
HEADINGS |
A1 - CLEARING JUNGLE |
A2 - CLEARING GRASS |
A3 - AVERAGE GIRTH 45 CMS, DIAMETER 15 CMS AND HEIGHT 3.0 M |
A4 - AVERAGE GIRTH 90 CMS, DIAMETER 30 CMS AND HEIGHT 5.0 M |
A5 - AVERAGE GIRTH 180 CMS, DIAMETER 60 CMS AND HEIGHT 7.0 M |
A6 - AVERAGE GIRTH 300 CMS, DIAMETER 100 CMS & HEIGHT 10.0 M |
A7 - SURFACE DRESSING : SOFT / LOOSE SOIL |
A8 - SURFACE DRESSING : HARD / DENSE SOIL |
A9 - BORING UP TO 6.0 M DEPTH |
A10 - BORING 6.0 M < DEPTH < 12.0 M |
A11 - BORING 12.0 M < DEPTH < 18.0 M |
A12 - PROVIDING AND PLACING FILTER |
A13 - G. I. PIPE FOR TUBEWELL |
A14 - PROVIDING AND PLACING HAND PUMP |
A15 - PLOUGHING EXISTING GROUND |
A16 - HOLE EXCAVATION + FILLING, IN ALL TYPES OF SOIL |
A17 - HOLE EXCAVATION IN SOFT ROCK WITH BLASTING |
A18 - HOLE EXCAVATION IN SOFT ROCK WITHOUT BLASTING |
A19 - HOLE EXCAVATION IN HARD ROCK WITH BLASTING |
A20 - HOLE EXCAVATION IN HARD ROCK WITHOUT BLASTING |
A21 - WATER TANK |
A22 - TEMPORARY FENCE |