PROGRAM  LIMITATIONS

Following are Program Limitations.
1. Gnatt Chart could be planned up to 24 months only. Hence subsequent Monthly Cash Flow, Material Consumption, Labour Consumption etc. are generated up to 24 Months only.
However project duration exceeding 24 months could be accommodated by copying the project file in to another file & constructing the bar chart assuming month no. 25 as month no. 1.
2. No automatic generation of quantities is possible from Graphics.
3. No Linkage to Auto Cad Drawing for automatic generation of quantities.
4. For Calculation of Monthly Cash Flows, the labour cost is calculated from the labour coefficients. However if the labour costs given are incorrect (i.e. too high or too low) then monthly cash flow will get affected up to that extent. 
For detailed Rate Analysis, refer our SUPER RATE ANALYSIS software.
5. Monthly & total material consumptions of only 4 items are generated.

Cement
Sand
Aggregate
Bitumen
   
6. Total labour trades are divided in to following 5 categories.

Mason
Carpenter
Skilled Labour
Unskilled Labour
Foreman