SCHEDULE OF QUANTITIES { S O Q }
SURVEY TENDER
Enter Quantity, Rate & Click Total.
ITEM NO DESCRIPTION QUANTITY UNIT RATE AMOUNT
1 Conducting plane table survey, locating nullah, road, electric & telephone lines, measuring boundaries, computing area etc.     Ha   
2 Conducting contour survey by taking spot levels on 10.0 M grid. Plotting interval shall be 0.50 M. Ha
3 Topographical survey around 100.0 M. from the plot with elevations etc. Ha
4 Constructing Bench Mark 300 sq x 600 mm deep in M10 concrete. It should project 300 mm above Ground level. Top of pedestal shall have a 150 mm sq x 6 mm thick insert plate suitably anchored in concrete. NO
5 same as above for co-ordinate pillars. NO
Note: 1 Ha = 10000 M2
{ Rs }