PROGRAM
HEADINGS |
B1 - ROUGH EXCAVATION / BANKING IN ALL KINDS OF SOILS B2 - BANKING EXCAVATED SOIL IN LAYERS B3 - EXCAVATION OVER AREAS IN ALL KINDS OF SOILS B4 - EXCAVATION OVER AREAS IN SOFT ROCK REQUIRING BLASTING B5 - EXCAVATION OVER AREAS IN SOFT ROCK WITHOUT BLASTING B6 - EXCAVATION OVER AREAS IN HARD ROCK REQUIRING BLASTING B7 - EXCAVATION OVER AREAS IN HARD ROCK WITHOUT BLASTING B8 - EXCAVATION IN ALL KINDS OF SOILS IN FOUNDATIONS B9 - EXCAVATION IN SOFT ROCK REQUIRING BLASTING IN FOUNDATIONS B10 - EXCAVATION IN SOFT ROCK WITHOUT BLASTING IN FOUNDATIONS B11 - EXCAVATION IN HARD ROCK REQUIRING BLASTING IN FOUNDATIONS B12 - EXCAVATION IN HARD ROCK WITHOUT BLASTING IN FOUNDATIONS B13 - PUMPING OUT WATER B14 - OPEN TIMBERING, DEPTH NOT EXCEEDING 1.5 M B15 - OPEN TIMBERING, 1.5 < DEPTH < 3.0 M B16 - OPEN TIMBERING, 3.0 < DEPTH < 4.5 M B17 - OPEN SHAFT RECTANGULAR TIMBERING, DEPTH < = 1.5 M B18 - OPEN SHAFT RECTANGULAR TIMBERING, 1.5 < DEPTH < 3.0 M B19 - OPEN SHAFT RECTANGULAR TIMBERING, 3.0 < DEPTH < 4.5 M B20 - OPEN CIRCULAR SHAFT TIMBERING, DEPTH < 1.5 M B21 - OPEN CIRCULAR SHAFT TIMBERING, 1.5 < DEPTH < 3.0 M B22 - OPEN CIRCULAR SHAFT TIMBERING, 3.0 < DEPTH < 4.5 M B23 - FILLING ALL KINDS OF AVAILABLE SOILS B24 - SUPPLY AND FILLING WITH RIVER SAND B25 - GROUND DRESSING B26 - SUPPLY OF 100 LITERS OF CHEMICAL EMULSION B27 - PRE-CONSTRUCTIONAL ANTI TERMITE TREATMENT B28 - POST-CONSTRUCTIONAL ANTI TERMITE TREATMENT B29 - POST-CONSTRUCTIONAL TREATMENT BELOW APRON B30 - ANTI TERMITE TREATMENT UNDER EXISTING FLOOR B31 - ANTI TERMITE TREATMENT OF EXISTING MASONRY B32 - ANTI TERMITE TREATMENT OF EXISTING WOOD WORK B33 - GENERAL EXCAVATION IN LARGE AREAS USING SHOVEL B34 - GENERAL EXCAVATION IN LARGE FOOTINGS USING JCB B35 - EXCAVATION OF ISOLATED FOOTING USING JCB B36 - EXV. OF ISOLATED FOOTING IN SOFT ROCK USING EXCAVATOR B37 - EXV. OF ISOLATED FOOTING IN HARD ROCK USING EXCAVATOR B38 - BACKFILLING WITH SHOVEL |