RIVER TRAINING WORKS

(Rate Analysis of Following Items are Covered in Roads Software)
 

15.1 - Boulder Laid Dry Without Wire Crates

15.2 - Boulder Apron Laid in Wire Crates

15.3 - Stone / Boulder Pitching on Slopes

15.4 - Filter Material Underneath Pitching in Slopes

15.5 - Geotextile Filter

15.6 - Rubble Stone Flooring in CM 1:3

15.7 - M15 Grade Cement Concrete block Flooring

15.8 - Dry Rubble Flooring

15.9 - Flexible Apron

15.10 - Gabian Structure for Retaining Earth

15.11 - Gabian Structure for Erosion Control/River Training/Protection