Pipe Culvert

(Rate Analysis of Following Items are Covered in Roads Software)
 

9.1 - PCC 1:3:6 in Foundation

9.2 - Laying NP4 / Prestressed Pipe in Single Row - 1000 mm dia

9.3 - Laying NP4 / Prestressed Pipe in Single Row - 1200 mm dia

9.4 - Laying NP4 / Prestressed Pipe in Double Row - 1000 mm dia

9.5 - Laying NP4 / Prestressed Pipe in Double Row - 1200 mm dia